NHS - Boston Pilgrim Hospital - Flat Roof Refurbishment

Works included removal and disposal of existing asphalt waterproofing and stramit board insulation to reveal structural deck.

This was then waterproofed with Self Adhesive VCL, 120mm PIR and Danosa 1.5mm Daonpol+ HS membrane mechanically fixed to deck.